Lorry body repairs

One of this weeks jobs has been a flatbed lorry body. The floor and side rails were badly corroded and damaged. The first job was to strip and remove the old material and clean and prepare for welding.

We used box section steel for the cross members and cut and folded channel sections for the side rails. The new floor was then fabricated and fitted along with corner posts and new hinges, and then completed with a coat of paint.

Call us for a welding, fabrication or engineering quote on 01636 830628

Latest News

Workshop Extension Takes Shape as Building Work Progresses

Hope you all had a great Bank Holiday weekend! Just like that we are into September! We thought we’d start the month with an update on our workshop extension and as you can see from the latest photo here, things are really starting to take shape. The builders are on site, as we speak and are […]

Read more »

iso logos Safe Contractor logo chas logo